Estimating software for renovations and extensions
Renovation drawings mix the old house with the new work. Plyrow reads which is which and measures only what you're building, with demolition where the plans call it.
What Plyrow measures for renovators
- New walls, rooms and openings, told apart from existing by the drawing's own conventions
- Demolition lines where the plans show walls or fittings removed
- Linings, skirting, tiles and paint for the new and altered rooms
- Roof, cladding and framing for the extension
- Doors and windows from the schedule, including replacements
Why renovators use it
A renovation quote is where guessing costs the most: the existing house hides the surprises. Measure the new work exactly and put the unknowns in writing as questions.
Variations are a fact of renovating. A change to the plan re-measures and re-prices, and the variation document shows the client what moved.
Clients compare quotes line by line. A BOQ they can read, with GST shown, wins more often than a lump sum.
How a job goes
The renovator drops in the set, including the existing and demolition plans where the architect drew them. The scan marks new against existing; the BOQ carries the new work and the demolition. The renovator checks the plan, answers the questions about what the drawings don't show (the existing floor, the services), and prices the job from their price book.
Days of measuring. An hour of checking.
Four steps from the drawing set to a priced quote, with a person checking each one.
Book a call- 01
Drop the plans in
The whole set as PDFs or CAD: plans, elevations, sections, schedules, the spec, the site plan.
- 02
It reads and measures
The scan measures every trade. The AI reads each sheet again and lists what no line covers.
- 03
You check, on the plan
Fix a wall, a room or a height where the scan misread. Answer what the drawings left open.
- 04
Price and quote
Your price book prices the BOQ. Set the margin. The quote goes out as a PDF with GST.
From the drawings: hatching, line weights, 'existing' and 'new' labels, and the demolition plan where there is one. Where it can't tell, it asks.
Yes. Group the lines by stage or by trade, and the quote and cost breakdown follow that grouping.
The new lower level is measured like any new work; the raised house above is existing. Put the lifting and restumping in as your own lines with your own rates.
Bring one process. We'll show you what fits.
We're in Brisbane, and on calls across Australia and the US.
Book a 30-minute call
Tell us about the process that eats the week. No cost, no obligation.
Book a call louis@plyrow.com +61 455 504 104Brisbane, Australia