Clients use the words interchangeably. The law and the courts don't. A quote is a price you are bound to; an estimate is your best guess, and a document that says one when it means the other costs builders money every year.

The difference

A quote is an offer to do defined work for a stated price. Once the client accepts it, that's the contract price, and only a variation changes it. An estimate is an informed guess at what the work will cost; it is not binding, and the final price can differ, though a client can argue if it differs wildly without warning.

Australian consumer law treats a quote as a representation about price. If the document is headed Quote, has a total and the client says yes, you are quoting, whether you meant to or not.

When to give which

Quote when the scope is defined: a full drawing set, a specification, known site conditions. Estimate when it isn't: a sketch, a conversation, a renovation with the walls still closed. Many builders do both: an estimate early to see if the client is serious, a quote once the drawings are done.

What a quote has to say

  • The scope: which drawings and which revision it was priced from, and what is excluded
  • The price, ex GST and inc GST, and whether the figures in the breakdown are one or the other
  • Allowances: provisional sums for work not yet designed, prime cost items for products the client will choose, each with the amount
  • How long the quote stands (30 days is common; materials move)
  • How a variation is priced and approved
  • Payment stages, and the builder's licence details where the state requires them

Where the software comes in

Plyrow measures the drawings into a bill of quantities, prices it from your rates and prints the quote with GST shown on every figure, allowances named as such, and the drawing revision it came from. A sent quote is locked; a change is a numbered revision or a variation document.

FAQ

Questions, answered.

Anything else, ask us on a call.

Get in touch

You can, but then it isn't a quote and the client may shop it. Decide which you're giving and say so in the heading.

A price to a consumer must be the total inc GST, and a tax invoice must show the GST. Showing ex, GST and inc on the quote avoids the argument later.

Within the quote's validity, that's your risk. Price it in, keep validity short, or make the quote subject to a materials escalation clause the client signs.

Reach out

Bring one process. We'll show you what fits.

We're in Brisbane, and on calls across Australia and the US.

Book a 30-minute call

Tell us about the process that eats the week. No cost, no obligation.

Book a call louis@plyrow.com +61 455 504 104

Brisbane, Australia