Glossary

The words on a quote, defined

Each term is defined the way the app uses it, so the BOQ and the quote read the same to you and to the client.

Takeoff
Measuring the quantities a job needs off the drawings: lengths, areas, volumes and counts, trade by trade. A quantity takeoff is the first half of an estimate; pricing is the second.
BOQ (bill of quantities)
The list of every item the job needs with its quantity, unit and, once priced, its rate and total. Grouped by trade in the order the job is built. The quote is the BOQ's total plus margin and GST.
Quote
What the client gets: the price for the job, with GST shown, and the scope it covers. In Australia a quote is a fixed-price offer; an estimate is not. A sent quote is locked, and a change to it is a revision.
Variation
A change to the job after the quote is accepted: something added, taken out or changed, with its own price. The variation document shows the client what moved and what it costs.
Rate
A price for one unit of a line, ex GST: per m2, per lm, each. Rates live in the price book and may be supply, labour or both.
Price book
A builder's own rates, imported from a spreadsheet or pasted from suppliers, with assemblies that group rates into the lines quoted. Every price on a quote comes from it.
Assembly
A line made of several rates: a plasterboard wall assembly carries the board, the fixings, the labour and the set per m2. The BOQ shows the assembly; the cost breakdown shows its parts.
Margin and markup
Markup is the percentage added to cost to reach price; margin is the share of the price that is profit. A 25% markup is a 20% margin. The quote review says which one is in use.
GST
Australia's 10% goods and services tax. Rates are ex GST; the quote shows the GST and the total inc GST, and every figure that could be read either way says which.
m2, lm, m3, each
The units trades price in: square metres for areas (linings, tiles, cladding), linear metres for lengths (skirting, cornice, gutters), cubic metres for volumes (concrete, fill) and each for counted items (doors, windows, fittings).
Scale
The ratio between the drawing and the building: 1:100 means 1 mm on the sheet is 100 mm built. Read from the title block and checked against the written dimensions; where they disagree, measuring a known length sets it.
Elevation
A drawing of one face of the building seen straight on. Elevations give heights, roof pitch, cladding and finishes, and the openings in each face.
Section
A drawing of the building cut through, showing floor-to-ceiling heights, roof framing, slab and footings. Sections settle the heights the floor plan can't.
Door and window schedule
A table listing each door and window by its tag (D01, W03) with its size, type and count. Reconciled with the tags on the plan; a mismatch goes to Check these.
Specification (spec sheet)
The written part of the set: wall types, lining and finish names, heights, fixtures and standards. Read row by row into lines and into the rules that measure them.
Linings
The boards on the inside of walls and ceilings, usually plasterboard, measured in m2 per room with the openings out. Wet-area board where the spec calls for it.
Skirting and architrave
The timber or MDF trim at the foot of a wall (skirting) and around a door or window (architrave), measured in lm per room. Whether skirting runs through doorways is a measuring choice.
Cladding
The external skin of a framed wall: weatherboard, fibre cement, panel or metal, measured in m2 per elevation, gross or net of openings as the builder chooses.
Brick veneer
A single skin of brick outside a timber or steel frame, the common Australian wall. Measured as face area off the elevations with openings out, with a lintel per opening.
Framing
The timber or steel skeleton of the walls and roof: studs, plates, noggins, lintels, trusses or rafters. Measured by wall type and height; load-bearing walls get a second top plate and lintels sized for the load.
Site works
The work on the ground before and around the building: cut and fill, retaining, drainage, paving, driveways, measured off the site plan and its levels.
Check these
The BOQ's list of what the drawings didn't settle: a height no sheet gives, a door count the plan and schedule disagree on, a line Claude thinks is missing. Each says why, and each is cleared by the builder.
Provisional sum and PC item
Allowances on a quote for work or items not yet decided: a provisional sum for work (the retaining wall once the engineer designs it), a prime cost (PC) item for a product the client will choose (the tapware). Shown on the quote as allowances.
New and existing
On a renovation set, the drawing's way of telling what is built already from what is to be built: hatching, line weights, labels and the demolition plan. The BOQ carries the new work and the demolition.
Reach out

Bring one process. We'll show you what fits.

We're in Brisbane, and on calls across Australia and the US.

Book a 30-minute call

Tell us about the process that eats the week. No cost, no obligation.

Book a call louis@plyrow.com +61 455 504 104

Brisbane, Australia